novo_motion_checklist
NovoMotion Checklist
In order to enable a file for processing the following steps need to have been accomplished:
- A schema has been added for the file.
- The schema has been activated.
- A SQL (or ACCESS) table has been created that matches the schema.
- ODBC Connectivity is configured. Note: A Unix server needs a properly configured Easysoft installation.
- A trigger has been added to the U2 file for updates (and deletes if desired).
- The trigger has been activated.
- The NovoMotion phantom is started.
novo_motion_checklist.txt · Last modified: 2021/02/05 16:24 by dlm